Cargando…

The Cryogenic System for the LHC Test String 2: Design, Commissioning and Operation

A 107-m long superconducting magnet string representing a full-cell of the LHC machine was designed for assembly and commissioning at CERN in order to validate the final design choices. This new facility, thereafter called Test String 2, and its cryogenic infrastructure cons ist of feed and return b...

Descripción completa

Detalles Bibliográficos
Autores principales: Blanco-Viñuela, E, Calzas, A, Casas-Cubillos, J, Chanat, D, Gomes, P, Knoops, S, Sanmartí, M, Serio, L, Suraci, A
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/593688