Cargando…

The Dismantling Project for the Large Electron Positron (LEP) Collider

The LEP accelerator was installed in a circular tunnel 27 km in length with nine access points distributed around the circumference in the countryside and villages which surround CERN's sites. The dismantling project involved the removal in less than 15 months of around 29000 tonnes of equipmen...

Descripción completa

Detalles Bibliográficos
Autor principal: Poole, John
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/595230