Cargando…
The QA_QC Results of the BIS-Module-0 Monitored Drift Tubes
The description of the Quality Assurance and Quality Control (QA_QC) procedure, the quality parameters verification and the obtained results are presented for the construction of the BIS-Module-0 Monitored Drift Tubes. In total 280 tubes have been tested at the NTU.
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/683973 |