Cargando…

The QA_QC Results of the BIS-Module-0 Monitored Drift Tubes

The description of the Quality Assurance and Quality Control (QA_QC) procedure, the quality parameters verification and the obtained results are presented for the construction of the BIS-Module-0 Monitored Drift Tubes. In total 280 tubes have been tested at the NTU.

Detalles Bibliográficos
Autores principales: Dris, M, Gazis, E N, Maltezos, S, Stavropoulos, G D, Avramidou, R
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/683973

Ejemplares similares