Cargando…

Test Beam Analysis of the First CMS MB2 Drift Tube Muon Chamber

In october 2001 the first MB2 DT chamber, produced at Madrid, was tested at the CERN Gamma Irradiation Facility (GIF) using a muon beam. A RPC structure was attached to the top of the chamber, and operated coupled together for the first time. The performance of the DT chamber was studied for several...

Descripción completa

Detalles Bibliográficos
Autores principales: Cerrada, Marcos, Autermann, Christian, Colino, Nicanor, Fernández de Troconiz, J, Fernández, C, Fouz-Iglesias, M C, Höpfner, K, Jimenez, Ignacio, Josa-Mutuberria, I, Puerta, J, Reithler, Hans, Romero, Luciano, Willmott, Carlos, de la Cruz, Begona
Lenguaje:eng
Publicado: 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/687498