Cargando…
Test Beam Analysis of the First CMS MB2 Drift Tube Muon Chamber
In october 2001 the first MB2 DT chamber, produced at Madrid, was tested at the CERN Gamma Irradiation Facility (GIF) using a muon beam. A RPC structure was attached to the top of the chamber, and operated coupled together for the first time. The performance of the DT chamber was studied for several...
Autores principales: | Cerrada, Marcos, Autermann, Christian, Colino, Nicanor, Fernández de Troconiz, J, Fernández, C, Fouz-Iglesias, M C, Höpfner, K, Jimenez, Ignacio, Josa-Mutuberria, I, Puerta, J, Reithler, Hans, Romero, Luciano, Willmott, Carlos, de la Cruz, Begona |
---|---|
Lenguaje: | eng |
Publicado: |
2003
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/687498 |
Ejemplares similares
-
Test beam analysis of the first CMS drift tube muon chamber
por: Albajar, C, et al.
Publicado: (2004) -
Fine synchronization of the muon drift tubes local trigger
por: Aldaya, M, et al.
Publicado: (2006) -
Validation of the Read Out Electronics for the CMS Muon Drift Chambers at Tests Beam in CERN/GIF
por: Fernández, C, et al.
Publicado: (2002) -
Quality control procedures applied to test the performance of the CMS muon drift chambers built at CIEMAT
por: Fouz-Iglesias, M C, et al.
Publicado: (2004) -
Electronics for the CMS muon drift tube chambers: the read-out minicrate
por: Fernandez Bedoya, Cristina, et al.
Publicado: (2005)