Cargando…

Installation of beam screens in LHC arc cryomagnets

Beam screens will be installed in the cold bores of the LHC arc cryodipoles and Short Straight Sections (SSS). This note describes the constraints on the beam screen installation imposed by the beam vacuum interconnects and Beam Position Monitors (BPM), and explains the installation scenario which h...

Descripción completa

Detalles Bibliográficos
Autores principales: Cruikshank, P, Lepeule, P, Schneider, G, Veness, R J M
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/691787