Cargando…
Installation of beam screens in LHC arc cryomagnets
Beam screens will be installed in the cold bores of the LHC arc cryodipoles and Short Straight Sections (SSS). This note describes the constraints on the beam screen installation imposed by the beam vacuum interconnects and Beam Position Monitors (BPM), and explains the installation scenario which h...
Autores principales: | Cruikshank, P, Lepeule, P, Schneider, G, Veness, R J M |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/691787 |
Ejemplares similares
-
The Preparation of the Cryomagnets and the Assembly of the LHC Test String 2
por: Andujar, O, et al.
Publicado: (2001) -
Beam Vacuum Interconnects for the LHC Cold Arcs
por: Veness, R J M, et al.
Publicado: (1999) -
Installation and commissioning of vacuum systems for the LHC particle detectors
por: Veness, R, et al.
Publicado: (2009) -
The Interconnections of the LHC Cryomagnets
por: Jacquemod, A, et al.
Publicado: (2001) -
The Alignment Jacks of the LHC Cryomagnets
por: Dwivedi, J, et al.
Publicado: (2004)