The String Shutdown Report: December 97 - March 98
The main reason for the shutdown was the installation of a tube containing a prototype auxiliary bus-bars cable. This tube runs in one of the beam tube apertures of the String from the front of MB1 to the rear of MB3 and is hydraulically connected to the cold mass of MB3. A ceramic leak tight feed-t...