Cargando…
Design and installation of the MSE septum system in the new LSS4 extraction channel of the SPS
For the extraction of the beam from the Super Proton Synchrotron (SPS) to ring 2 of the Large Hadron Collider (LHC) and the CERN Neutrino to Gran Sasso (CNGS) facility, a new fast-extraction system has been installed in the long straight section LSS4 of the SPS. Besides extraction bumpers, enlarged...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2003
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702757 |