Cargando…
Design and installation of the MSE septum system in the new LSS4 extraction channel of the SPS
For the extraction of the beam from the Super Proton Synchrotron (SPS) to ring 2 of the Large Hadron Collider (LHC) and the CERN Neutrino to Gran Sasso (CNGS) facility, a new fast-extraction system has been installed in the long straight section LSS4 of the SPS. Besides extraction bumpers, enlarged...
Autores principales: | Balhan, B, Goddard, B, Guinand, R, Luiz, F, Rizzo, A, Weterings, W |
---|---|
Lenguaje: | eng |
Publicado: |
2003
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702757 |
Ejemplares similares
-
Alignment and girder position of MSE septa in the new LSS4 extraction channel of the SPS
por: Balhan, B, et al.
Publicado: (2003) -
The Septum Magnet System of the New Fast Extraction Channel of the SPS at CERN
por: Balhan, B, et al.
Publicado: (2003) -
Modifications to the SPS LSS6 Septa for LHC and the SPS Septa Diluters
por: Borburgh, Y, et al.
Publicado: (2007) -
Beam Commissioning of the SPS LSS6 Extraction and TT60 for LHC
por: Balhan, B, et al.
Publicado: (2007) -
Performance of the SPS extraction channel equipment in 1996
por: Balhan, B, et al.
Publicado: (1997)