Cargando…
Installation and commissioning of the helium refrigeration system for the CMS Magnet
A new helium refrigeration plant with a cooling capacity of 800 W at 4.45 K, 4500 W between 60 K and 80 K, and 4 g/s liquefaction simultaneously has been installed in its temporary position inside the Compact Muon Solenoid assembly hall at CERN. The commissioning of the compressor station has been a...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2004.831048 http://cds.cern.ch/record/730548 |