Installation and commissioning of the helium refrigeration system for the CMS Magnet

A new helium refrigeration plant with a cooling capacity of 800 W at 4.45 K, 4500 W between 60 K and 80 K, and 4 g/s liquefaction simultaneously has been installed in its temporary position inside the Compact Muon Solenoid assembly hall at CERN. The commissioning of the compressor station has been a...

Descripción completa

Detalles Bibliográficos
Autores principales: Perinic, G, Dupont, T F, Legrand, Dominique, Pezzetti, M
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2004.831048
http://cds.cern.ch/record/730548
_version_ 1780903823280177152
author Perinic, G
Dupont, T F
Legrand, Dominique
Pezzetti, M
author_facet Perinic, G
Dupont, T F
Legrand, Dominique
Pezzetti, M
author_sort Perinic, G
collection CERN
description A new helium refrigeration plant with a cooling capacity of 800 W at 4.45 K, 4500 W between 60 K and 80 K, and 4 g/s liquefaction simultaneously has been installed in its temporary position inside the Compact Muon Solenoid assembly hall at CERN. The commissioning of the compressor station has been achieved, the commissioning of the cold box and the cryostats is under way. First operation results are presented.
id cern-730548
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2004
record_format invenio
spelling cern-7305482019-09-30T06:29:59Zdoi:10.1109/TASC.2004.831048http://cds.cern.ch/record/730548engPerinic, GDupont, T FLegrand, DominiquePezzetti, MInstallation and commissioning of the helium refrigeration system for the CMS MagnetAccelerators and Storage RingsA new helium refrigeration plant with a cooling capacity of 800 W at 4.45 K, 4500 W between 60 K and 80 K, and 4 g/s liquefaction simultaneously has been installed in its temporary position inside the Compact Muon Solenoid assembly hall at CERN. The commissioning of the compressor station has been achieved, the commissioning of the cold box and the cryostats is under way. First operation results are presented.CERN-AT-2004-008-ECRoai:cds.cern.ch:7305482004-04-14
spellingShingle Accelerators and Storage Rings
Perinic, G
Dupont, T F
Legrand, Dominique
Pezzetti, M
Installation and commissioning of the helium refrigeration system for the CMS Magnet
title Installation and commissioning of the helium refrigeration system for the CMS Magnet
title_full Installation and commissioning of the helium refrigeration system for the CMS Magnet
title_fullStr Installation and commissioning of the helium refrigeration system for the CMS Magnet
title_full_unstemmed Installation and commissioning of the helium refrigeration system for the CMS Magnet
title_short Installation and commissioning of the helium refrigeration system for the CMS Magnet
title_sort installation and commissioning of the helium refrigeration system for the cms magnet
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/TASC.2004.831048
http://cds.cern.ch/record/730548
work_keys_str_mv AT perinicg installationandcommissioningoftheheliumrefrigerationsystemforthecmsmagnet
AT duponttf installationandcommissioningoftheheliumrefrigerationsystemforthecmsmagnet
AT legranddominique installationandcommissioningoftheheliumrefrigerationsystemforthecmsmagnet
AT pezzettim installationandcommissioningoftheheliumrefrigerationsystemforthecmsmagnet