Cargando…
Reliability of Beam Loss Monitors System for the Large Hadron Collider
The employment of superconducting magnets, in the high energies colliders, opens challenging failure scenarios and brings new criticalities for the whole system protection. For the LHC beam loss protection system, the failure rate and the availability requirements have been evaluated using the Safet...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1063/1.1831141 http://cds.cern.ch/record/745755 |