Cargando…

Grounding, Shielding and Power Distribution for the LHCb Silicon Tracking

This note lists the relevant items for power and grounding, it explains the sensitive detector input signal circuits and describes the grounding, power distribution and line filtering measures applied to each of the electrical units of the LHCb silicon tracking system. This note deals with both sili...

Descripción completa

Detalles Bibliográficos
Autores principales: Bauer, C, Esperanto, D, Frei, R, Straumann, U, Vázquez, P, Vollhardt, A
Lenguaje:eng
Publicado: 2005
Materias:
Acceso en línea:http://cds.cern.ch/record/836185