Cargando…
Piquet Note: Setting-up the SPS 1-Turn Feedback, 1-Turn Feedforward and Longitudinal Damper
For the SPS to operate as the LHC injector the impedance of the 200 MHz cavities had to be reduced much more than achievable with the 1-Turn Feedback operational in the late nineties. An upgrade program was therefore launched [1]. This resulted in the design and installation of an upgraded 1-Turn Fe...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/839741 |