Cargando…
Performance of the CERN SPS Fast Extraction for the CNGS Facility
The SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the long baseline neutrino (CNGS) facility. For the latter two extractions spaced by 50 ms, each affecting half of the SPS, are foreseen. During the shutdown 2003-2004 the performance of the fast extraction ki...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/844014 |