Cargando…
Performance of the CERN SPS Fast Extraction for the CNGS Facility
The SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the long baseline neutrino (CNGS) facility. For the latter two extractions spaced by 50 ms, each affecting half of the SPS, are foreseen. During the shutdown 2003-2004 the performance of the fast extraction ki...
Autores principales: | Gaxiola, Enrique, Arduini, Gianluigi, Höfle, Wolfgang, Roncarolo, Federico, Vogel, Elmar, Vossenberg, Eugène B |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/844014 |
Ejemplares similares
-
Damping of betatron oscillations in the SPS appearing at the two step extraction of CNGS beam
por: Vogel, E, et al.
Publicado: (2005) -
Upgrade and Tests of the SPS Fast Extraction Kicker System for LHC and CNGS
por: Humberto Gaxiola, Enrique, et al.
Publicado: (2004) -
Simulation of Transient Beam-Feedback Interaction and Application to Extraction of CNGS Beam from the SPS
por: Vogel, E, et al.
Publicado: (2004) -
Running LHC and CNGS beams in the SPS: Discussion
por: Arduini, Gianluigi
Publicado: (2000) -
Upgrade and Tests of the SPS Fast Extraction Kicker System for LHC and CNGS
por: Gaxiola, E, et al.
Publicado: (2004)