Cargando…
Beam Tests of Final Modules and Electronics of the LHCb Outer Tracker in 2005
This note presents the results of the beam tests of the mass production modules of the LHCb Outer Tracker equipped with final version prototypes of the frontend electronics. The tests were performed in March 2005 at DESY, using a 6 GeV electron beam.
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/896901 |