Cargando…
Visit to FDI Technology, Saint Petersburg, 7-9 November 2005 Travel Report
The Superconducting H- Linac under study at CERN, and thus the LINAC 4 and, well before, the 3 MeV test stand, require a high performance beam chopper. It has to establish the required beam time-structure by deflecting towards a dump part of the beam entering the chopper line. The deflector basicall...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/911969 |