Cargando…

SPS tunnels fill up

Here the installation of a 25 tons beam dump. Wim Middelkoop stands near the wall (2nd on the left); Peter Sievers stands on the left behind the magnet; Eric Geiger is 3rd along the wall on the right.

Detalles Bibliográficos
Autor principal: CERN PhotoLab
Publicado: 1974
Materias:
Acceso en línea:http://cds.cern.ch/record/916831