Cargando…
SPS tunnels fill up
Here the installation of a 25 tons beam dump. Wim Middelkoop stands near the wall (2nd on the left); Peter Sievers stands on the left behind the magnet; Eric Geiger is 3rd along the wall on the right.
Autor principal: | |
---|---|
Publicado: |
1974
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/916831 |