Cargando…
Visiting the SPS installation
...., Guenther Loehr, Hans Horisberger walk along the SPS tunnel: here, on the right, an absorber block of 22 tons for beam dumping in the external beam lines. The chariot serves for the installation of the block.
Publicado: |
1975
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/917537 |