Cargando…

Assembly of the gantry crane for lowering CMS into the cavern

The gantry crane (dark red in the image) that will be used for lowering the enormous pieces of CMS into its cavern, 100m underground, is being assembled. Recently the horizontal cross-beam was delivered and installed, and can be seen on top of the SX5 construction hall at Cessy, France.

Detalles Bibliográficos
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/924800