Assembly of the gantry crane for lowering CMS into the cavern
The gantry crane (dark red in the image) that will be used for lowering the enormous pieces of CMS into its cavern, 100m underground, is being assembled. Recently the horizontal cross-beam was delivered and installed, and can be seen on top of the SX5 construction hall at Cessy, France.
Publicado: |
2006
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/924800 |
Ejemplares similares
-
Assembly of the gantry crane for lowering CMS into the cavern
por: Tejinder S. Virdee
Publicado: (2006) -
Images of the gantry crane at point 5
por: Virdee, TS, et al.
Publicado: (2008) -
Delivery and assembly of the 80 T cranes in SX5
por: L. Veillet
Publicado: (2000) -
The CMS cavern at Point 5 (SX5) in February 2005
por: Tejinder S. Virdee
Publicado: (2005) -
Lowering of a "dummy load" of around 400 tonnes into the CMS UXC55 underground cavern using the fixed gantry crane.
por: Nicolas Siegrist
Publicado: (2006)