Cargando…

Test and First Experiments with the new REX-ISOLDE 200 MHz IH-Structure

For the REX-ISOLDE accelerator, a new accelerating structure is at the moment installed and tested. It willl raise the final energy from the present 2.3 MeV/u to 3 MeV/u. The aim is to increase the mass range of the nuclei available for nuclear spectroscopy from mass 40 to mass 80. The new accelerat...

Descripción completa

Detalles Bibliográficos
Autor principal: Sieber, T
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:http://cds.cern.ch/record/925505