Cargando…
Test and First Experiments with the new REX-ISOLDE 200 MHz IH-Structure
For the REX-ISOLDE accelerator, a new accelerating structure is at the moment installed and tested. It willl raise the final energy from the present 2.3 MeV/u to 3 MeV/u. The aim is to increase the mass range of the nuclei available for nuclear spectroscopy from mass 40 to mass 80. The new accelerat...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/925505 |