Cargando…

New Accelerating Modules RF Test at TTF

Five new accelerating modules were installed into the TTF tunnel as a part of the VUV FEL Linac. They are tested prior to the linac operation. The RF test includes processing of the superconducting cavities, as well as maximum module performance tests. The test procedure and the achieved performance...

Descripción completa

Detalles Bibliográficos
Autor principal: Kostin, D
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:http://cds.cern.ch/record/925602