High Voltage Measurements on Nine PFNs for the LHC Injection Kicker Systems
Each of the two LHC injection kicker magnet systems must produce a kick of 1.3 T.m with a flattop duration variable up to 7.86 microseconds, and rise and fall times of less than 900 ns and 3 microseconds, respectively. A kicker magnet system consists of four 5 Ohm transmission line magnets with matc...