Cargando…
High Voltage Measurements on Nine PFNs for the LHC Injection Kicker Systems
Each of the two LHC injection kicker magnet systems must produce a kick of 1.3 T.m with a flattop duration variable up to 7.86 microseconds, and rise and fall times of less than 900 ns and 3 microseconds, respectively. A kicker magnet system consists of four 5 Ohm transmission line magnets with matc...
Autores principales: | Barnes, Michael J, Ducimetière, Laurent, Wait, Gary D |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/928000 |
Ejemplares similares
-
Low Voltage Measurements on Nine PFNs for the LHC Injection Kicker Systems
por: Wait, G, et al.
Publicado: (2002) -
High voltage measurements on a prototype PFN for the LHC injection kickers
por: Barnes, M J, et al.
Publicado: (1999) -
The LHC injection kicker magnet
por: Ducimetière, Laurent, et al.
Publicado: (2003) -
High Voltage Performance of the Beam Screen of the LHC Injection Kicker Magnets
por: Barnes, MJ, et al.
Publicado: (2014) -
Transverse impedance measurements and simulations of the LHC injection kicker magnet
por: Vlachodimitropoulos, Vasileios, et al.
Publicado: (2019)