Cargando…
First joint test beam of CMS Drift Tubes (DT) and Resistive Plate Chambers (RPC)
The first full size muon drift tube chamber ever built for the CMS barrel with the final cell design (constructed at CIEMAT, Madrid) was succesfully tested with a muon beam in September 2001 at the Gamma Irradiation Facility (GIF) at CERN. For the first time also both muon detectors for the CMS barr...
Autor principal: | |
---|---|
Publicado: |
2001
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/944097 |