Cargando…

Inside the PS tunnel

Pre-start work is going on at the end of the PS long shut-down. The photo shows secondary beams drawn from an internal target (bottom) towards South Hall, behind the shielding wall (top) (see also photo 7409012X).

Detalles Bibliográficos
Publicado: 1974
Materias:
Acceso en línea:http://cds.cern.ch/record/968967