Cargando…
Inside the PS tunnel
Pre-start work is going on at the end of the PS long shut-down. The photo shows secondary beams drawn from an internal target (bottom) towards South Hall, behind the shielding wall (top) (see also photo 7409012X).
Publicado: |
1974
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/968967 |