Cargando…
Target station of the SC ISOLDE mass separator
The ISOLDE target is hidden behind the HT shielding box. The tunnel leads to the spent proton-beam absorber (beam dump). Stig Sundell stands on the left. At the time of the picture (upgrade period) the beam line leading to target was not (yet) installed.
Publicado: |
1974
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/969058 |