Cargando…

Target station of the SC ISOLDE mass separator

The ISOLDE target is hidden behind the HT shielding box. The tunnel leads to the spent proton-beam absorber (beam dump). Stig Sundell stands on the left. At the time of the picture (upgrade period) the beam line leading to target was not (yet) installed.

Detalles Bibliográficos
Publicado: 1974
Materias:
Acceso en línea:http://cds.cern.ch/record/969058
Descripción
Sumario:The ISOLDE target is hidden behind the HT shielding box. The tunnel leads to the spent proton-beam absorber (beam dump). Stig Sundell stands on the left. At the time of the picture (upgrade period) the beam line leading to target was not (yet) installed.