Cargando…

Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France.

The two halves of the Forward Hadronic Calorimeter (HF) were transported from the CERN Meyrin site to the surface assembly hall at LHC Point 5 in Cessy, France, during the first part of July. Transporting these 300 tonne objects involved the construction around them of a 65-metre long trailer, simul...

Descripción completa

Detalles Bibliográficos
Autores principales: Florelle Antoine, Gary Perrenoud
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/974081