Cargando…
Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France.
The two halves of the Forward Hadronic Calorimeter (HF) were transported from the CERN Meyrin site to the surface assembly hall at LHC Point 5 in Cessy, France, during the first part of July. Transporting these 300 tonne objects involved the construction around them of a 65-metre long trailer, simul...
Autores principales: | , |
---|---|
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/974081 |
_version_ | 1780910876430172160 |
---|---|
author | Florelle Antoine Gary Perrenoud |
author_facet | Florelle Antoine Gary Perrenoud |
author_sort | Florelle Antoine |
collection | CERN |
description | The two halves of the Forward Hadronic Calorimeter (HF) were transported from the CERN Meyrin site to the surface assembly hall at LHC Point 5 in Cessy, France, during the first part of July. Transporting these 300 tonne objects involved the construction around them of a 65-metre long trailer, simultaneously pushed and pulled by two trucks at either end. The main road between St. Genis and Cessy was closed during these operations and a police escort was provided for the ~5 hour journeys. The two HF halves will be the first major elements to be lowered by the gantry crane into the underground experimental cavern around the end of July or beginning of August. |
id | cern-974081 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2006 |
record_format | invenio |
spelling | cern-9740812019-09-30T06:29:59Zhttp://cds.cern.ch/record/974081Florelle AntoineGary PerrenoudTransport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France.OUTREACHThe two halves of the Forward Hadronic Calorimeter (HF) were transported from the CERN Meyrin site to the surface assembly hall at LHC Point 5 in Cessy, France, during the first part of July. Transporting these 300 tonne objects involved the construction around them of a 65-metre long trailer, simultaneously pushed and pulled by two trucks at either end. The main road between St. Genis and Cessy was closed during these operations and a police escort was provided for the ~5 hour journeys. The two HF halves will be the first major elements to be lowered by the gantry crane into the underground experimental cavern around the end of July or beginning of August.CMS-PHO-OREACH-2006-025oai:cds.cern.ch:9740812006-07-11 |
spellingShingle | OUTREACH Florelle Antoine Gary Perrenoud Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France. |
title | Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France. |
title_full | Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France. |
title_fullStr | Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France. |
title_full_unstemmed | Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France. |
title_short | Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France. |
title_sort | transport of the hadronic forward (hf) calorimeter from building 186 (cern meyrin site) to the cms construction hall at point 5, cessy, france. |
topic | OUTREACH |
url | http://cds.cern.ch/record/974081 |
work_keys_str_mv | AT florelleantoine transportofthehadronicforwardhfcalorimeterfrombuilding186cernmeyrinsitetothecmsconstructionhallatpoint5cessyfrance AT garyperrenoud transportofthehadronicforwardhfcalorimeterfrombuilding186cernmeyrinsitetothecmsconstructionhallatpoint5cessyfrance |