Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France.
The two halves of the Forward Hadronic Calorimeter (HF) were transported from the CERN Meyrin site to the surface assembly hall at LHC Point 5 in Cessy, France, during the first part of July. Transporting these 300 tonne objects involved the construction around them of a 65-metre long trailer, simul...
Autores principales: | Florelle Antoine, Gary Perrenoud |
---|---|
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/974081 |
Ejemplares similares
-
Assembly of the CMS HF (hadron forward) calorimeter, April 2003 to June 2005
por: Tejinder S. Virdee, CERN
Publicado: (2005) -
The supermodule insertion tool of the CMS electromagnetic calorimeter is leaving to the experimental hall located at P5.
Publicado: (2006) -
First half-barrel of the CMS hadron calorimeter successfully asembled
Publicado: (2001) -
Installation of the first Cathode Strip Chambers (CSC) of CMS at P5 (Cessy, France) on June 2003
Publicado: (2003) -
The construction of the CMS electromagnetic calorimeter: crystal assembly
Publicado: (2005)