Cargando…

Performance of LHC Main Dipoles for Beam Operation

At present about 90% of the main dipoles for the LHC have been manufactured and one of the three cold mass assemblers has already completed the production. 85% of the 1232 dipoles needed for the tunnel have been tested and accepted. In this paper we mainly deal with the performance results: the quen...

Descripción completa

Detalles Bibliográficos
Autores principales: De Rijk, Gijsbert, Bajko, Marta, Bottura, Luca, Buzio, Marco Carlo Luigi, Chohan, Vinod, Deniau, Laurent, Fessia, Paolo, García-Pérez, Juan, Hagen, Per, Koutchouk, Jean-Pierre, Kozak, Janusz, Miles, John, Missiaen, Dominique Pierre, Modena, Michele, Pugnat, Pierre, Remondino, Vittorio, Rossi, Lucio, Sanfilippo, Stephane, Savary, Frederic, Siemko, Andrzej Piotr, Smirnov, Nikolay, Stafiniak, Andrzej, Todesco, Ezio, Tommasini, Davide, Vlogaert, Jos, Völlinger, Christine, Walckiers, Louis, Wildner, Elena
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/977797