Cargando…
Status of the CLIC Test Facility (CTF3)
The CTF3 project, being built within the frame-work of an international collaboration involving presently 15 institutions, is advancing as planned. To date, the electron linac with its sub-harmonic bunching system, the magnetic chicane for bunch-length variations, and the Delay Loop have been instal...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/999487 |