Cargando…
Status of the CLIC Test Facility (CTF3)
The CTF3 project, being built within the frame-work of an international collaboration involving presently 15 institutions, is advancing as planned. To date, the electron linac with its sub-harmonic bunching system, the magnetic chicane for bunch-length variations, and the Delay Loop have been instal...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/999487 |
_version_ | 1780911647039160320 |
---|---|
author | Geschonke, Günther |
author_facet | Geschonke, Günther |
author_sort | Geschonke, Günther |
collection | CERN |
description | The CTF3 project, being built within the frame-work of an international collaboration involving presently 15 institutions, is advancing as planned. To date, the electron linac with its sub-harmonic bunching system, the magnetic chicane for bunch-length variations, and the Delay Loop have been installed. The 1.5 GHz sub-harmonic bunching system with fast phase switching allows the longitudinal position of the bunches to be changed every 140 ns. This phase-coded beam has been successfully injected into the Delay Loop using an RF deflector and bunch interleaving of 140 ns long sub-bunch trains which double the bunch repetition frequency has been demonstrated in the extraction line. In addition to its role as a test bed for the CLIC RF power source, CTF3 is being used as a source of high-power RF at 30 GHz for the testing of CLIC accelerating structures. In this power-generating mode, about 100 MW of 30 GHz power is routinely extracted from the beam half-way up the linac by special-purpose power-extracting structures and transported to the high-gradient test area by low-loss waveguides. This paper describes the overall status of the CTF3 project and outlines the plans for the future. |
id | cern-999487 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2006 |
record_format | invenio |
spelling | cern-9994872023-07-20T15:00:54Zhttp://cds.cern.ch/record/999487engGeschonke, GüntherStatus of the CLIC Test Facility (CTF3)Accelerators and Storage RingsThe CTF3 project, being built within the frame-work of an international collaboration involving presently 15 institutions, is advancing as planned. To date, the electron linac with its sub-harmonic bunching system, the magnetic chicane for bunch-length variations, and the Delay Loop have been installed. The 1.5 GHz sub-harmonic bunching system with fast phase switching allows the longitudinal position of the bunches to be changed every 140 ns. This phase-coded beam has been successfully injected into the Delay Loop using an RF deflector and bunch interleaving of 140 ns long sub-bunch trains which double the bunch repetition frequency has been demonstrated in the extraction line. In addition to its role as a test bed for the CLIC RF power source, CTF3 is being used as a source of high-power RF at 30 GHz for the testing of CLIC accelerating structures. In this power-generating mode, about 100 MW of 30 GHz power is routinely extracted from the beam half-way up the linac by special-purpose power-extracting structures and transported to the high-gradient test area by low-loss waveguides. This paper describes the overall status of the CTF3 project and outlines the plans for the future.CERN-OPEN-2006-069CLIC-Note-696oai:cds.cern.ch:9994872006-11-20 |
spellingShingle | Accelerators and Storage Rings Geschonke, Günther Status of the CLIC Test Facility (CTF3) |
title | Status of the CLIC Test Facility (CTF3) |
title_full | Status of the CLIC Test Facility (CTF3) |
title_fullStr | Status of the CLIC Test Facility (CTF3) |
title_full_unstemmed | Status of the CLIC Test Facility (CTF3) |
title_short | Status of the CLIC Test Facility (CTF3) |
title_sort | status of the clic test facility (ctf3) |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/999487 |
work_keys_str_mv | AT geschonkegunther statusoftheclictestfacilityctf3 |