Cargando…
Status of the CLIC Test Facility (CTF3)
The CTF3 project, being built within the frame-work of an international collaboration involving presently 15 institutions, is advancing as planned. To date, the electron linac with its sub-harmonic bunching system, the magnetic chicane for bunch-length variations, and the Delay Loop have been instal...
Autor principal: | Geschonke, Günther |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/999487 |
Ejemplares similares
-
Results from the CLIC Test Facility CTF3 and Update on the CLIC Design
por: Geschonke, Günther
Publicado: (2008) -
An Injector for the CLIC Test Facility (CTF3)
por: Braun, H, et al.
Publicado: (2000) -
An injector for the CLIC test Facility (CTF3)
por: Braun, Hans-Heinrich, et al.
Publicado: (2008) -
An injector for the CLIC test facility (CTF3)
por: Braun, H, et al.
Publicado: (2000) -
Results from the CLIC Test Facility CFT3 and update on the CLIC Design
por: Geschonke, Günther
Publicado: (2008)