Cargando…

Feasibility Studies for 100 GeV Beam Transfer Lines for a CERN Neutrino Facility

For a potential future CERN neutrino facility it is considered to extract a 100 GeV proton beam from the second long straight section in the SPS into the existing TT20 transfer line leading to the North Area. Two transfer line design options were developed simultaneously: early-branching from TT20 u...

Descripción completa

Detalles Bibliográficos
Autores principales: Kowalska, Magdalena, Bartmann, Wolfgang, Bracco, Chiara, Goddard, Brennan, Nessi, Marzio, Steerenberg, Rende, Velotti, Francesco M
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2003166