Feasibility Studies for 100 GeV Beam Transfer Lines for a CERN Neutrino Facility
For a potential future CERN neutrino facility it is considered to extract a 100 GeV proton beam from the second long straight section in the SPS into the existing TT20 transfer line leading to the North Area. Two transfer line design options were developed simultaneously: early-branching from TT20 u...
Autores principales: | Kowalska, Magdalena, Bartmann, Wolfgang, Bracco, Chiara, Goddard, Brennan, Nessi, Marzio, Steerenberg, Rende, Velotti, Francesco M |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2003166 |
Ejemplares similares
-
Design Study of a 100 GeV Beam Transfer Line from the SPS for a Short Baseline Neutrino Facility
por: Bartmann, W, et al.
Publicado: (2013) -
Non-local Fast Extraction from the CERN SPS at 100 and 440 GeV
por: Velotti, F M, et al.
Publicado: (2013) -
Feasibility Study of a CERN PS Injection at 2 GeV
por: Borburgh, J, et al.
Publicado: (2011) -
CERN PSB to PS Transfer Modifications for the 2 GeV Upgrade
por: Bartmann, W, et al.
Publicado: (2012) -
New PSB H$^{−}$ Injection and 2 GeV Transfer to the CERN PS
por: Bartmann, Wolfgang, et al.
Publicado: (2015)