Cargando…
Electron beam deceleration measurements using the decelerator test beam line in the Compact Linear Collider test facility
We discuss beam deceleration through a series of 12 power extraction and transfer structures, at the CLIC test facility 3 at CERN, as a proof-of-principle of the CLIC deceleration scheme. Up to 36% of the kinetic energy of an electron drive beam is extracted and converted to 12 GHz rf power. We look...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1103/PhysRevSTAB.17.031003 http://cds.cern.ch/record/2135832 |