Cargando…

Smart monitoring system based on adaptive current control for superconductingcable test

A smart monitoring system for superconducting cable test is proposed with an adaptive currentcontrol of asuperconductingtransformer secondary. The design, based on Fuzzy Gain Scheduling, allows thecontrollerparameters to adapt continuously, and finely, to the working variations arising fromtransform...

Descripción completa

Detalles Bibliográficos
Autores principales: Arpaia, Pasquale, Ballarino, Amalia, Daponte, Vincenzo, Montenero, Giuseppe, Svelto, Cesare
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:https://dx.doi.org/10.1063/1.4902977
http://cds.cern.ch/record/2135849