Cargando…

Progress of the Klystron and Cavity Test Stand for the FAIR Proton Linac

In collaboration between the FAIR project, GSI, and CNRS, the IPNO lab provided the high power RF components for a cavity and klystron test stand. For initial operation of the 3 MW Thales TH2181 klystron at 325.224 MHz we received a high voltage modulator from CERN Linac 4 as a loan. Here we report,...

Descripción completa

Detalles Bibliográficos
Autores principales: Schnase, Alexander, Joly, Christophe, Lesrel, Jean, Plechov, Evgenij, Salvatore, Julian, Schreiber, Gerald, Vinzenz, Wolfgang
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:http://cds.cern.ch/record/2142499