Cargando…
Progress of the Klystron and Cavity Test Stand for the FAIR Proton Linac
In collaboration between the FAIR project, GSI, and CNRS, the IPNO lab provided the high power RF components for a cavity and klystron test stand. For initial operation of the 3 MW Thales TH2181 klystron at 325.224 MHz we received a high voltage modulator from CERN Linac 4 as a loan. Here we report,...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2142499 |
Sumario: | In collaboration between the FAIR project, GSI, and CNRS, the IPNO lab provided the high power RF components for a cavity and klystron test stand. For initial operation of the 3 MW Thales TH2181 klystron at 325.224 MHz we received a high voltage modulator from CERN Linac 4 as a loan. Here we report, how we integrated the combination of klystron, high voltage modulator, and auxiliaries to accumulate operating experience. RF operation of the klystron started on a water cooled load, soon the circulator will be included and then the prototype CH cavity in the radiation shielded area will be powered. The 45 kW amplifiers for the 3 buncher structures of the FAIR proton Linac were checked at the test stand, and the results are presented here. |
---|