Cargando…

The 40 MHz trigger-less DAQ for the LHCb Upgrade

The LHCb experiment will undergo a major upgrade during the second long shutdown (2018–2019), aiming to let LHCb collect an order of magnitude more data with respect to Run 1 and Run 2. The maximum readout rate of 1 MHz is the main limitation of the present LHCb trigger. The upgraded detector, apart...

Descripción completa

Detalles Bibliográficos
Autores principales: Campora Perez, D H, Falabella, A, Galli, D, Giacomini, F, Gligorov, V, Manzali, M, Marconi, U, Neufeld, N, Otto, A, Pisani, F, Vagnoni, V M
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.1016/j.nima.2015.10.047
http://cds.cern.ch/record/2263108