Cargando…

SPS Injection and Beam Quality for LHC Heavy Ions With 150 ns Kicker Rise Time

As part of the LHC Injectors Upgrade project for LHC heavy ions, the SPS injection kicker system rise time needs reduction below its present 225 ns. One technically challenging option under consideration is the addition of fast Pulse Forming Lines in parallel to the existing Pulse Forming Networks f...

Descripción completa

Detalles Bibliográficos
Autores principales: Goddard, Brennan, Carlier, Etienne, Ducimetière, Laurent, Kotzian, Gerd, Uythoven, Jan, Velotti, Francesco
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2016-TUPMR048
http://cds.cern.ch/record/2207352