Cargando…
SPS Injection and Beam Quality for LHC Heavy Ions With 150 ns Kicker Rise Time
As part of the LHC Injectors Upgrade project for LHC heavy ions, the SPS injection kicker system rise time needs reduction below its present 225 ns. One technically challenging option under consideration is the addition of fast Pulse Forming Lines in parallel to the existing Pulse Forming Networks f...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-TUPMR048 http://cds.cern.ch/record/2207352 |
_version_ | 1780951681270284288 |
---|---|
author | Goddard, Brennan Carlier, Etienne Ducimetière, Laurent Kotzian, Gerd Uythoven, Jan Velotti, Francesco |
author_facet | Goddard, Brennan Carlier, Etienne Ducimetière, Laurent Kotzian, Gerd Uythoven, Jan Velotti, Francesco |
author_sort | Goddard, Brennan |
collection | CERN |
description | As part of the LHC Injectors Upgrade project for LHC heavy ions, the SPS injection kicker system rise time needs reduction below its present 225 ns. One technically challenging option under consideration is the addition of fast Pulse Forming Lines in parallel to the existing Pulse Forming Networks for the 12 kicker magnets MKP-S, targeting a system field rise time of 100 ns. An alternative option is to optimise the system to approach the existing individual magnet field rise time (2-98%) of 150 ns. This would still significantly increase the number of colliding bunches in LHC while minimising the cost and effort of the system upgrade. The observed characteristics of the present system are described, compared to the expected system rise time, together with results of simulations and measurements with 175 and 150 ns injection batch spacing. The expected beam quality at injection into LHC is quantified, with the emittance growth and simulated tail population taking into account expected jitter and synchronisation errors, damper performance and SPS non-linear optics behavior. The outlook for deployment is discussed, with the implications for LHC operation and HL-LHC performance. |
id | oai-inspirehep.net-1469903 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
record_format | invenio |
spelling | oai-inspirehep.net-14699032022-08-10T12:47:51Zdoi:10.18429/JACoW-IPAC2016-TUPMR048http://cds.cern.ch/record/2207352engGoddard, BrennanCarlier, EtienneDucimetière, LaurentKotzian, GerdUythoven, JanVelotti, FrancescoSPS Injection and Beam Quality for LHC Heavy Ions With 150 ns Kicker Rise TimeAccelerators and Storage RingsAs part of the LHC Injectors Upgrade project for LHC heavy ions, the SPS injection kicker system rise time needs reduction below its present 225 ns. One technically challenging option under consideration is the addition of fast Pulse Forming Lines in parallel to the existing Pulse Forming Networks for the 12 kicker magnets MKP-S, targeting a system field rise time of 100 ns. An alternative option is to optimise the system to approach the existing individual magnet field rise time (2-98%) of 150 ns. This would still significantly increase the number of colliding bunches in LHC while minimising the cost and effort of the system upgrade. The observed characteristics of the present system are described, compared to the expected system rise time, together with results of simulations and measurements with 175 and 150 ns injection batch spacing. The expected beam quality at injection into LHC is quantified, with the emittance growth and simulated tail population taking into account expected jitter and synchronisation errors, damper performance and SPS non-linear optics behavior. The outlook for deployment is discussed, with the implications for LHC operation and HL-LHC performance.CERN-ACC-2016-273oai:inspirehep.net:14699032016 |
spellingShingle | Accelerators and Storage Rings Goddard, Brennan Carlier, Etienne Ducimetière, Laurent Kotzian, Gerd Uythoven, Jan Velotti, Francesco SPS Injection and Beam Quality for LHC Heavy Ions With 150 ns Kicker Rise Time |
title | SPS Injection and Beam Quality for LHC Heavy Ions With 150 ns Kicker Rise Time |
title_full | SPS Injection and Beam Quality for LHC Heavy Ions With 150 ns Kicker Rise Time |
title_fullStr | SPS Injection and Beam Quality for LHC Heavy Ions With 150 ns Kicker Rise Time |
title_full_unstemmed | SPS Injection and Beam Quality for LHC Heavy Ions With 150 ns Kicker Rise Time |
title_short | SPS Injection and Beam Quality for LHC Heavy Ions With 150 ns Kicker Rise Time |
title_sort | sps injection and beam quality for lhc heavy ions with 150 ns kicker rise time |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2016-TUPMR048 http://cds.cern.ch/record/2207352 |
work_keys_str_mv | AT goddardbrennan spsinjectionandbeamqualityforlhcheavyionswith150nskickerrisetime AT carlieretienne spsinjectionandbeamqualityforlhcheavyionswith150nskickerrisetime AT ducimetierelaurent spsinjectionandbeamqualityforlhcheavyionswith150nskickerrisetime AT kotziangerd spsinjectionandbeamqualityforlhcheavyionswith150nskickerrisetime AT uythovenjan spsinjectionandbeamqualityforlhcheavyionswith150nskickerrisetime AT velottifrancesco spsinjectionandbeamqualityforlhcheavyionswith150nskickerrisetime |