Cargando…
CERN Beam Interlock Redundant Dump Trigger Module Performance during LHC Run 2
During the Long Shutdown 1 an additional link between the Beam Interlocks System and the LHC Beam Dumping System was installed. This third channel is a direct access from the BIS to the asynchronous dump triggering lines. This paper describes the experience collected for the first 10 months of opera...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOY041 http://cds.cern.ch/record/2207498 |