Cargando…

CERN Beam Interlock Redundant Dump Trigger Module Performance during LHC Run 2

During the Long Shutdown 1 an additional link between the Beam Interlocks System and the LHC Beam Dumping System was installed. This third channel is a direct access from the BIS to the asynchronous dump triggering lines. This paper describes the experience collected for the first 10 months of opera...

Descripción completa

Detalles Bibliográficos
Autores principales: Calcoen, Daniel, Gabourin, Stéphane, Siemko, Andrzej
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOY041
http://cds.cern.ch/record/2207498