CERN Beam Interlock Redundant Dump Trigger Module Performance during LHC Run 2
During the Long Shutdown 1 an additional link between the Beam Interlocks System and the LHC Beam Dumping System was installed. This third channel is a direct access from the BIS to the asynchronous dump triggering lines. This paper describes the experience collected for the first 10 months of opera...
Autores principales: | Calcoen, Daniel, Gabourin, Stéphane, Siemko, Andrzej |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2016-THPOY041 http://cds.cern.ch/record/2207498 |
Ejemplares similares
-
Implementation of a Direct Link between the LHC Beam Interlock System and the LHC Beam Dumping System Re-Triggering Lines
por: Gabourin, S, et al.
Publicado: (2014) -
Changes to the LHC Beam Dumping System for LHC Run 2
por: Uythoven, Jan, et al.
Publicado: (2015) -
LHC beam dumping system: status and readiness for LHC Run 2
por: Magnin, N, et al.
Publicado: (2014) -
Fibre Monitoring System for the Beam Permit Loops at the LHC and Future Evolution of the Beam Interlock System
por: García-Argos, Carlos, et al.
Publicado: (2015) -
Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System: Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System
por: Vatansever, Volkan
Publicado: (2014)